EEdunet Portal
MSP ANNUAL CONNECTIVITY QUOTE FOR SHEFFIELD

MSP Annual Connectivity Quote Flow For Sheffield
Find The Cost.

Built for MSPs supporting schools across Sheffield and South Yorkshire with a locked supplier-backed quote step inside the free MSP account, not a public price result.

MSP detail gateEstimate locked until submitted
Use a named MSP business email address.
Defaults: 5 quotes per AE per day, 8-working-hour supplier wait, 5 working days.
This estimate uses an 8-working-hour supplier quote delay as a conservative baseline. In some cases, supplier responses can take longer, but the calculator deliberately avoids using worst-case timings.
The hourly baseline is based on the 2026 UK minimum wage / National Living Wage rate of £12.71.

Submit the MSP details to unlock the estimate.

This estimate uses an 8-working-hour supplier quote delay as a conservative baseline. In some cases, supplier responses can take longer, but the calculator deliberately avoids using worst-case timings.

MSP quote-delay calculator

  • Designed for MSPs supporting schools across Sheffield and South Yorkshire.
  • Shows the estimate only after MSP details are submitted.
  • Uses 5 quotes per AE per day, 8 working hours, GBP 12.71 and 5 working days.

How the estimate works

Enter MSP details and account executive count. LeadSync applies the conservative quote-delay formula before showing weekly, monthly and annual estimates.

What happens next

A live supplier-backed quote is available inside the free MSP account once account access is created.

Common questions

Is the estimate shown before the MSP submits details?

No. The page requires MSP name, company, business email and account executive count first.

Is the live supplier-backed quote shown on the public page?

No. The public page shows it as a locked next step inside the free MSP account.

1000mbps Annual Quote: the Sheffield school landscape

MSPs quoting gigabit connectivity into Sheffield education are addressing 562 open state-funded schools, 61% of which sit inside multi-academy trusts where connectivity decisions may be made centrally. Secondary settings (70 schools, average roll 1188) drive most 1000Mbps demand.

  • Secondary settings driving bandwidth demand: 70, averaging 1188 pupils on roll
  • Primary schools with lighter connectivity profiles: 422
  • Estate covered by the S feed: 562 open schools

Figures are aggregates of the public GIAS-derived school feed published on this site and refresh with it. They describe the local landscape only — nothing here is specific to an individual school until one is selected above.

How large is the Sheffield 1000mbps annual quote opportunity for an MSP?

The S postcode area behind this 1000mbps annual quote page covers 562 open state-funded schools (422 primary, 70 secondary) with around 210,000 pupils on roll, per the public GIAS-derived school feed published on this site.

Who signs off 1000mbps annual quote decisions in Sheffield schools?

For 1000mbps annual quote, 344 of the 562 open schools here (61%) belong to a multi-academy trust where sign-off is often central; the other 218 procure independently through their own business managers.

Related pages